Page 1 of 1

Cedar Hill Stage ***Partially Paved***

Posted: May 3rd, 2012, 2:04 pm
by coltspeed
Not sure how much of it has been covered cause one main access point has been blocked off with material (Pitch). Right after RT2012 the villagers signed a petition complaining about the dust for the two days the stages ran. Only when the material is cleared up i will see how much work they did. The area is located by the bridge where the tunnel is right off the main road, on both sides paved. They actually thought they could of got the cars to stop running for good but instead it was paved :lol: . They don,t even know about TTRC when i asked them if they knew "who organizing dem ting in d back dey?"