TriniTuner.com | Latest Event:
Moderator: 3ne2nr Mods
Ben_spanna wrote:they have started widening the roadway after O2 park heading West …. somethings afoot!
Ben_spanna wrote: Talks coming back that the proposed Carenage Williams beach Bypass road coming back on stream, and if you have not been down that far in some time, they have started widening the roadway after O2 park heading West …. somethings afoot!
And then yuh wake up and realize this is Trinidadwagonrunner wrote:the road should have been raised to allow pedestrians to walk below it through a tunnel to the car park. and the car park made multi story with pick up / drop off, change / shower facilities, maxi / bus / disabled parking on the ground floor
goalpost wrote:MOWT has a plan to widen the southern side of WMR from Scallywag to Teteron.
Dont know why.
K74T wrote:Ben_spanna wrote:they have started widening the roadway after O2 park heading West …. somethings afoot!
I believe that they are doing this to designate a lane for cyclists.
Return to “Ole talk and more Ole talk”
Users browsing this forum: Google [Bot] and 10 guests